Dual Direction Detonation Arrestors

As part of an ongoing project we are completing with Ensham resources, AMM had completed the design and construction of 5 Dual Direction Detonation Arrestors for use in on site de-gassing infrastructure. The design incorporates 4 isolation valves in conjunction […]

Machinery Access Systems Auditing Services

With the recent industry increase in scrutiny of Machinery Access Systems, AMM has begun completing AS5327 compliance audits for various machine operators to complete their required site introduction documentation and/or gap analysis prior to rebuilds. Our experienced team of personnel […]

Pump Pod Overhaul

In another trash to treasure story, AMM has finished work on the complete re-certification and overhaul of a 10,000 L Pump Pod for Kestrel Coal Resources for use in their De-Watering System Upgrade. The pod was completely stripped down and […]

QDS Fuel Pod MDG36 Overhaul

Brought back from the edge of the scrap heap, AMM has just completed work on the first complete overhaul and upgrade of  Kestrel Coal Resource’s 2000L QDS Diesel Pod fleet.   Following a complete sandblast, NDT Inspection and repairs the […]