Dual Direction Detonation Arrestors
As part of an ongoing project we are completing with Ensham resources, AMM had completed the design and construction of 5 Dual Direction Detonation Arrestors for use in on site de-gassing infrastructure. The design incorporates 4 isolation valves in conjunction with 2 flame arrestor units. Each unit is fitted with a magnahelix differential pressure gauge…
AMM Product Development Capabilities
Please follow the attached link to our Capability Statement, we are here and able to help with anything at the drop of a hat.

Machinery Access Systems Auditing Services
With the recent industry increase in scrutiny of Machinery Access Systems, AMM has begun completing AS5327 compliance audits for various machine operators to complete their required site introduction documentation and/or gap analysis prior to rebuilds. Our experienced team of personnel can rapidly inspect various types of machinery located throughout the Bowen basin and surrounds to…

Pump Pod Overhaul
In another trash to treasure story, AMM has finished work on the complete re-certification and overhaul of a 10,000 L Pump Pod for Kestrel Coal Resources for use in their De-Watering System Upgrade. The pod was completely stripped down and inspected before undergoing a number of structural modification to both be Australian Standard compliant as…
Loading…
Something went wrong. Please refresh the page and/or try again.